Tobler Monolithic Formwork Tobler Scaffolding & Formwork Private Limited Tobler Scaffolding & Formwork Private Limited

Bestseller

Tobler Monolithic Formwork

arrow Your advantages

  • High strength and lightweight panels for easier handling and reduced on-site labor
  • Fast construction cycles with floor cycles as short as 7 days for quicker project completion
  • Up to 150 reuse cycles to maximize return on investment
  • Swiss engineering precision ensures accuracy, durability, and consistent results
  • Eco-friendly and sustainable
  • Cost-effective across multiple projects with lower overall cost per cycle
  • Enhanced worker safety thanks to strong, stable, and reliable formwork systems
  • Customizable designs adaptable to diverse architectural requirements
  • First class after-sales support

Aluminium Formwork Systems – Tobler Monolithic Solutions

 

At Tobler Scaffolding and Formwork Pvt. Ltd., Swiss engineering and technology meet the needs of modern construction. With a clear focus on quality, precision, and performance, the Monolithic Aluminium Formwork Systems are designed to support fast, safe, and cost-efficient building processes.

Manufactured using high-grade Aluminium Alloy 6061-T6, Tobler’s systems offer long-lasting durability, consistent results, and smooth concrete finishes with minimal need for post-treatment.

 

Verticals

Tobler provides a complete solution for all vertical construction needs:

  • Wall Panels
  • Column Formwork
  • Lift Core and Staircase Formwork
  • Shear Wall Systems
  • Core Wall Systems

All components are engineered for fast assembly, structural strength, and surface precision.



Monolithic Formwork System

 

Tobler’s aluminium formwork system enables single-pour construction for walls, slabs, beams, staircases, and other structural parts. This significantly reduces construction time and labour requirements.

 

Technical Specifications:

  • Material: Aluminium Alloy 6061 T6
  • Panel Load Capacity: 65 kN
  • Reusability: Up to 150 cycles with proper maintenance
  • Floor Cycle Time: One floor completed in 7 days

The Tobler Monolithic Formwork system ensures accuracy, high speed, and optimal concrete quality.

 

Key advantages:

 

  • High strength and lightweight panels for easier handling and reduced on-site labor
  • Fast construction cycles with floor cycles as short as 7 days for quicker project completion.
  • Up to 150 reuse cycles to maximize return on investment.
  • Swiss Engineering precision   ensures accuracy, durability, and consistent results.
  • Eco-Friendly and sustainable by reducing timber usage and site waste.
  • Cost-effective across multiple projects with lower overall cost per cycle.
  • Enhanced worker safety thanks to strong, stable, and reliable formwork systems
  • Customizable designs adaptable to diverse architectural requirements.
  • First class after-sales support:
    • Technical training and on-site assistance
    • Panel maintenance advisory
    • Ongoing Engineering support throughout project klifecycle

 

At Tobler, we don’t just supply formwork — we become your construction partner.


Driven by Swiss Engineering  

 

Tobler India combines Swiss Engineering   excellence with Make in India initiative to deliver high-performance aluminium formwork systems. Our solutions are trusted by leading developers for their reliability, efficiency, and global consistency.

Whether it's high-rise towers, residential townships, or commercial complexes — Tobler’s formwork solutions deliver consistent results across continents.

 

Nitesh Sharma

Sr. Vice President
T: +91 62833 70032
nitesh.sharma@tobler-india.com

Field Service Abroad